• Login
No Result
View All Result
4WARDWEGO
  • Home
    • Home – Layout 1
    • Home – Layout 2
    • Home – Layout 3
    • Home – Layout 4
    • Home – Layout 5
  • Parenting
  • Family
  • Lifestyle
  • Health
  • Food
  • Baby & Toddler
  • Home
    • Home – Layout 1
    • Home – Layout 2
    • Home – Layout 3
    • Home – Layout 4
    • Home – Layout 5
  • Parenting
  • Family
  • Lifestyle
  • Health
  • Food
  • Baby & Toddler
No Result
View All Result
4WARDWEGO
No Result
View All Result
Home Uncategorized

British America Junction Flyover: Plateau Govt directs closure of vehicular movement around British America Junction

IMB Kallamu by IMB Kallamu
in Uncategorized
0
British America Junction Flyover: Plateau Govt directs closure of vehicular movement around British America Junction
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Plateau state government on Saturday directed the closure of  vehicular traffic beginning Sunday around th let British American Junction to Lamingo Junction as it is begins construction of the Interchange Fly over .

A statement signed by Pam Bot-Mang, the 

Honourable Commissioner of Works,

Plateau State and made available to newsmen in Jos reads that the  general public may recall that it  recently issued a Press Statement on the construction of a fly over at the British American Junction .

The statement reads in parts ” In keeping to our promise to regularly give updates on the construction activities of the project, we therefore wish the general public to know that the surveys which included Geotechnical surveys, soil tests, load tests, etc. have been concluded and setting out/markings are being rounded up.

 “The construction work proper is set to commence and the contractor requires full control of the construction site with little or no obstruction and/or interference from vehicular/human traffic in line with safety protocols.”

It is in this light, that we are issuing this travel advisory for the general public to note. 

The British America junction will be closed to vehicular traffic beginning Sunday, 30th January, 2022 till further notice to enable the contractors set out for the construction please.

The road closure will be at the Plateau State Water Board water treatment plant for the Dogon Karfe Axis; At the Guaranty Trust Bank U-turn for the Murtala Mohammed Way axis; And at Film Corporation junction for Liberty Boulevard axis.

The statement also reads that “By this development therefore, motorists are advised to find alternative routes to their destinations some of which include the following:

1. Tudun Wada Ring road to Domkat Bali Road.

2. Secretariat junction through Plateau Hospital Road.

3. Plateau Hospital roundabout through D. B. Zang way.

4. Abbattoir-Dogon Karfe through Plateau State Dental Hospital Road.

5. Abbattoir-Dogon Karfe Roundabout through Hopehill Hospital to Ministry of Lands and Survey-ECWA Headquarters Road.

6. Rayfield to Lamingo Road.

7. Gold and Base through Shiaka to Liberty Boulevard Road.”

The same will apply for those leaving Jos township to Bukuru and beyond.

The government regrets all inconveniences that will emerge as a result of this development and urges understanding and cooperation of the citizens. The Rescue Administration once more calls on all the good and peace-loving people of Plateau State to collaborate with the government to be able to achieve this noble project that has been highly anticipated.

By Golok Nanmwa ,Jos

IMB Kallamu

IMB Kallamu

Award winning Blogger | Influencer | Digital Marketing Strategist | Content Creator | Lover of Entertainment.... On a journey to conquest. Hit me Up: +234 09010888777

Recommended

Plateau APC submits list of LG candidates to PLASIEC

APC Unveils 2027 Primary Timetable, Sets Presidential Nomination Form at ₦100m

18 hours ago
Retired Police Officers Storm Presidential Villa, Demand Exit from Pension Scheme

Retired Police Officers Storm Presidential Villa, Demand Exit from Pension Scheme

1 day ago

Trending

Hilarious Sunnie: Life Times 2.0: A Theatrical Experience Set to Inspire in Jos This April

Hilarious Sunnie: Life Times 2.0: A Theatrical Experience Set to Inspire in Jos This April

5 days ago
Haj. Safiyya Isa, FTGMF, A+ Hub Lead Push as Plateau Youths Reject Mob Lynching in Jos

Haj. Safiyya Isa, FTGMF, A+ Hub Lead Push as Plateau Youths Reject Mob Lynching in Jos

3 days ago

Popular

Over 70 Students Matriculated at College of Peace and Reconciliation Studies, Jos

Over 70 Students Matriculated at College of Peace and Reconciliation Studies, Jos

2 weeks ago
Burna Boy – African Giant (Full Album Download)

Burna Boy – African Giant (Full Album Download)

7 years ago
Nigerian lady assaulted by father, brothers after she was caught having s3x (VIDEO)

Nigerian lady assaulted by father, brothers after she was caught having s3x (VIDEO)

5 years ago
Lil Wayne – Uproar ft. Swizz Beatz

Lil Wayne – Uproar ft. Swizz Beatz

3 years ago
Ruger – Useless

Ruger — Snapchat

4 years ago
  • About
  • Shop
  • Forum
  • Contact
Call us: +1 234 JEG THEME

Copyright © 2013 - 2024 - 4wardwego Blog

No Result
View All Result
  • About
  • Blog
  • Cart
  • Checkout
  • Facebook Demo
  • Facebook Demo
  • Facebook Demo
  • Home
  • Home 1
  • Home 2
  • Home 3
  • Home 4
  • Home 5
  • Home1
  • Home2
  • Homee
  • My account
  • My Instagram Feed Demo
  • My Instagram Feed Demo
  • My Instagram Feed Demo
  • Shop

Copyright © 2013 - 2024 - 4wardwego Blog

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

WhatsApp us